Modular Industrial Utility Building

Seven-module prefabricated 46' x 80' utility building with dual 300 HP chillers, 100 HP air compressors, glycol chilling, safety systems, and full pre-wired electrical, delivered ready for reassembly on site.

Aurora, NC
$6,000,000

Application

Modular utility building supporting industrial process operations.

System Details

Seven-module prefabricated utility building assembled into a 46' x 80' structure. Systems include dual 300 HP water chillers, dual 100 HP air compressors, glycol chilling system, tepid water generation system for eyewash and safety showers, smoke and fire alarm system, HVAC, emergency ventilation, lighting, and safety systems. Electrical systems were fully pre-wired prior to shipment. The building was fully manufactured, assembled, and tested prior to site delivery.

Treatment Objectives

Provide centralized utilities and safety infrastructure for industrial facility operations.

Project Highlights

  • Seven-module 46' x 80' prefabricated utility building
  • Dual 300 HP water chillers and dual 100 HP air compressors
  • Glycol chilling system + tepid water generation for safety showers / eyewash
  • Integrated HVAC, emergency ventilation, smoke and fire alarm systems
  • Fully pre-wired electrical, factory-tested before shipment

Outcome

Prefabricated building delivered, reassembled onsite, tested, certified, and commissioned for operational use.