Borger Wastewater Treatment System

200 GPM treatment system with dual bag and sand filters, dual air strippers (parallel/series), and three Falco 600 Electric Catalytic Oxidizers for off-gas control, housed in an 80' x 100' building PRM built on site to Class 1 Div 2 standards.

Borger, TX
Commissioning Q2 2026
$4,000,000

Application

Wastewater treatment with onsite hydrocarbon removal.

System Details

200 GPM treatment system, dual bag and sand filter systems with full automation. Dual air stripper systems designed to work in both parallel and series operations. All installed in an 80' x 100' building constructed on site by PRM with full control package. Off-gas treatment is provided by three Falco 600 Electric Catalytic Oxidizers for control of vapor emissions. System was built to NEC Class 1, Division 2 Hazardous location standards due to the potential for flammable gasses to be present on site.

Treatment Objectives

Onsite treatment of wastewater for removal of hydrocarbons.

Project Highlights

  • 200 GPM treatment capacity with full automation
  • Dual bag and sand filter systems
  • Dual air strippers configurable in parallel or series
  • Three Falco 600 Electric Catalytic Oxidizers on the off-gas stream
  • 80' x 100' building constructed on site by PRM
  • Engineered to NEC Class 1, Division 2 Hazardous location standards

Outcome

Project currently underway. Commissioning scheduled for Q2 2026.